建设工程施工合同索赔时效若干问题研究
[Abstract]:The term of limitation of claim for a construction contract under construction is defined as a waiver of the right to claim if the claimant exercises the right of claim within the agreed time limit after the occurrence of the claim in the course of the execution of the construction contract, Its right of claim is attributed to the legal system of contract of extinction. The agreed period is the period of limitation for claims, usually 28 days. The period of limitation for claims is one of the periods of limitation for the elimination of claims. The statute of limitations for claims can be found in various models of contracts. If the Ministry of Construction, the State Administration of Industry and Commerce formulated the "Construction contract of Construction Project" (GF-1999-0201) general clause 36.2 states: "A claim must be made after the occurrence of the claim. 28
【分类号】:D923.6
【相似文献】
相关期刊论文 前10条
1 刘红林;关于铁路货物运输合同纠纷的索赔时效和诉讼时效[J];人民司法;1990年09期
2 张铁鞠;;“亚洲”轮货损索赔争议仲裁案[J];中国海商法年刊;1990年00期
3 禾木;财产保险的火灾索赔[J];上海消防;1994年04期
4 禾木;火灾人身伤亡的保险给付[J];上海消防;1994年05期
5 张国良;论保险时效[J];上海保险;1995年10期
6 谢丛龙;保险索赔权的消灭时效[J];上海保险;1996年08期
7 谢丛龙;保险索赔权的消灭时效[J];内蒙古保险;1996年05期
8 刘国胜;第三人违反合同侵犯委托财产行纪人应依法承担民事责任[J];河北法学;1998年03期
9 王斌;海事诉讼的时效问题[J];天津航海;1998年01期
10 董萧,孙保国;签订及履行国际货物买卖合同应注意的法律问题[J];对外经贸实务;1999年04期
相关重要报纸文章 前10条
1 ;如何投保能避风险[N];中国旅游报;2002年
2 贝政明;通知期限、理赔期限与索赔时效[N];中国保险报;2003年
3 ;人寿保险索赔时注意事项[N];国际金融报;2003年
4 孟于群;管好每个环节的风险[N];国际商报;2003年
5 水吉;寿险拒赔原因种种[N];中国劳动保障报;2003年
6 陈云霞;CIF价格条件下货运险索赔程序及问题[N];中国保险报;2004年
7 张绍阳;《保险法》推敲之四[N];证券时报;2004年
8 特约撰稿 朱树英;正确理解是充分运用的前提[N];建筑时报;2005年
9 杨易挺;此案是否已超过索赔和诉讼时效[N];中国保险报;2006年
10 管廷阳 潘友卿;此案未超过索赔和诉讼时效[N];中国保险报;2006年
相关硕士学位论文 前3条
1 辛海;海事赔偿责任限制法律制度研究[D];上海海事大学;2004年
2 赵海虹;产品责任保险及相关法律问题研究[D];华东政法学院;2002年
3 刘惠明;施工索赔的现状及对策[D];西安建筑科技大学;2007年
,本文编号:2194303
本文链接:https://www.wllwen.com/falvlunwen/minfalunwen/2194303.html