变电工程全寿命周期设计新技术研究
[Abstract]:With the rapid development of economy in our country, the construction of electric power facilities is advancing continuously. As an important industry of the country, electric power enterprises have been realizing the maximization of economic and social income. At present, the project cost management model introduced in China's electric power industry can not realize the goal of maximizing the cost and income of electric power enterprises. The whole life cycle cost (Life Cycle Cost,LCC) management is based on the object of project life cycle, through the cost control of project decision, design, construction, operation and maintenance, etc. It is a kind of goal management method that realizes the life cycle cost minimization. It has three main characteristics: full cost, whole system, whole process. This paper firstly analyzes the concept of life-cycle cost management and the history of the decision-making method of power transformation engineering, and at the same time expounds the research situation at home and abroad, taking the whole life cycle as the angle of view, the investment decision of the transformation project in our country. The existing problems and the causes are analyzed. A series of concepts, such as life-cycle cost management, are put forward to apply to the main points of management in each stage of investment decision of substation project and the relevant decision methods based on the concept of life-cycle cost management. In order to optimize the original substation project investment decision-making work. In this paper, an application method of selecting main transformer and maintenance strategy of transformer based on life cycle cost theory is put forward. The optimization method of main transformer based on the life-cycle cost theory is based on the analysis of the economic load rate of the recovery cost of the main transformer, and the selection process of the capacity and the number of the main transformer is put forward. The selection direction of the main transformer capacity and the number of stations is reprogrammed to simplify the whole phase of the work. The content of this paper can be used for reference in analyzing the application of life cycle cost in substation engineering.
【学位授予单位】:华北电力大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:TM72
【参考文献】
相关期刊论文 前10条
1 吴云飞;汪涛;;资产全寿命周期管理在建设智能电网中的应用[J];湖北电力;2010年S1期
2 黄瑞萍;夏莹;;变电站投资费用模型及敏感因素分析[J];技术经济;2009年09期
3 本刊编辑部;;国家电网公司全面推广实施“两型一化”、“两型三新”[J];华北电力技术;2009年05期
4 韩天祥;李莉华;余颖辉;;用LCC进行500kV变电站改造经济性评价[J];中国设备工程;2008年03期
5 吴奕亮;金家善;辜健;罗云;;寿命周期费用技术及其应用要点[J];上海电力;2004年04期
6 帅军庆;;全寿命周期成本管理是公司可持续发展的重要举措[J];上海电力;2004年03期
7 韩天祥;黄华炜;陆一春;;LCC管理技术在国外电力系统的研究与应用[J];上海电力;2004年03期
8 姜益民;;变压器的全寿命周期成本分析[J];上海电力;2004年03期
9 夏业勤,史有德;电力变压器组件的LCC管理与变电站的经济运行[J];变压器;2001年08期
10 陈海松,严骏,熊云;应用LCC分析法进行工程装备的选型[J];建设机械技术与管理;2001年02期
相关硕士学位论文 前6条
1 王海波;丰镇500KV变电工程项目施工组织设计研究[D];华北电力大学;2013年
2 陈兴福;变电工程施工标准化管理模式的研究与应用[D];华北电力大学;2013年
3 康虎;全寿命周期管理在变电工程设计中的应用[D];华北电力大学;2012年
4 孙雁楠;变电工程施工成本管理研究[D];华北电力大学;2011年
5 王勋;基于全寿命周期成本管理的变电工程决策研究[D];重庆交通大学;2011年
6 苗秀成;北京市京电变电工程处市场经营战略研究[D];华北电力大学(北京);2008年
,本文编号:2293789
本文链接:https://www.wllwen.com/guanlilunwen/chengbenguanlilunwen/2293789.html