广州地铁指挥中心基坑围护结构设计及变形控制研究
[Abstract]:This paper studies the design and displacement control of the retaining structure of the foundation pit of the Guangzhou Metro Command Center, and through the comparative analysis of the research background, the significance and the research situation at home and abroad, The design and displacement control of the retaining structure of the foundation pit of the Guangzhou Metro Command Center are analyzed and studied. The analysis of the deformation mechanism of the foundation pit, the analysis of the influencing factors, the comparison of the design of the retaining structure of the foundation pit, the monitoring and control of the displacement of the foundation pit and the like are given. (1) The factors affecting the deformation of the foundation pit are various, but the main function is the geological conditions, the hydrological conditions, the earth pressure, the foundation pit design conditions, the scale of the foundation pit, the construction conditions of the foundation pit and the seepage state of the foundation pit, etc., At the same time, the above-mentioned factors are also the factors leading to the deformation of the retaining structure of the foundation pit, and the process of concrete action is more complicated; (2) the settlement of the surface can affect the surrounding buildings, and the effect on the surrounding buildings also has certain regularity: when the deep foundation pit is excavated, a relatively large plastic region is formed around the foundation pit, and at the same time, due to the action of plastic flow, the soil body outside the foundation pit is gradually started to flow to the inner side of the foundation pit and the bottom of the foundation pit, so that the settlement of the surface is increased, and the damage of the surrounding building is finally caused; (3) The failure form of the foundation pit has different forms, but the cause of different failure modes is often caused by the different embedment depth of the foundation pit; and (4) before the foundation pit enclosure construction is carried out, the general situation of the work of the foundation pit and the engineering environment and the design principle of the foundation pit are designed, the design scheme of the foundation pit retaining structure, the construction scheme of the foundation pit enclosing structure and the like are carefully calculated and verified; (5) the new technology for the foundation pit monitoring, such as the neural network prediction, the computer technology, the automation technology, the photographic technology, the optical sound wave, The introduction of electromagnetic sound measurement technology and remote sensing aerial survey technology can not only rapidly and accurately carry out the real-time monitoring of the foundation pit's dynamic, but also can greatly reduce the manpower.
【学位授予单位】:石家庄铁道大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TU753
【参考文献】
相关期刊论文 前7条
1 朱占国;赵文;李慎刚;纪新博;唐志扬;;地铁深基坑支护结构计算方法研究[J];地下空间与工程学报;2013年05期
2 刘杰;姚海林;任建喜;;地铁车站基坑围护结构变形监测与数值模拟[J];岩土力学;2010年S2期
3 卢光辉;;深基坑工程发展现状综述[J];西部探矿工程;2006年08期
4 曲艺,段红波;某高层建筑基坑支护设计、施工与监测[J];海岸工程;2005年02期
5 王庆,潘志刚;基坑支护结构类型及选型原则综述[J];西部探矿工程;2005年05期
6 张潇,刘祖强,朱振彪;高层建筑物(群)深基坑工程变形监测与信息化施工[J];地理空间信息;2004年03期
7 ;Study on Deep Well Dewatering Optimization Design in Deep Foundation Pit and Engineering Application[J];Journal of China University of Geosciences;2002年01期
相关博士学位论文 前3条
1 李淑;基于变形控制的北京地铁车站深基坑设计方法研究[D];北京交通大学;2013年
2 王卫;成都地铁深基坑工程变形控制研究[D];成都理工大学;2011年
3 徐中华;上海地区支护结构与主体地下结构相结合的深基坑变形性状研究[D];上海交通大学;2007年
相关硕士学位论文 前10条
1 张婷;西安地铁韦曲南站深基坑变形规律现场监测研究[D];西安科技大学;2013年
2 王利宾;郑州地铁某标段出入段线工作井基坑支护技术研究[D];河南大学;2013年
3 李贺龙;朝阳公园地铁车站基坑开挖的变形规律研究[D];中国地质大学(北京);2013年
4 陈小巍;地铁深基坑围护结构变形监测与数值模拟[D];湖南工业大学;2013年
5 兰国友;地铁大型车站深基坑支护稳定监测与变形控制研究[D];中南大学;2012年
6 占三军;地铁车站深基坑围护结构变形监测与数值模拟[D];武汉理工大学;2012年
7 谢朝果;武汉中山公园地铁站深基坑围护结构变形现场监测与数值模拟[D];武汉理工大学;2011年
8 李晓旭;铁路地下车站大型深基坑支护设计与变形控制研究[D];西南交通大学;2011年
9 陈昭庆;沈阳地铁二号线文体路—五里河区间基坑监测与分析[D];东北大学;2009年
10 周玲;深基坑内支撑支护结构上的土压力分布研究[D];浙江工业大学;2009年
,本文编号:2486094
本文链接:https://www.wllwen.com/guanlilunwen/chengjian/2486094.html