当前位置:主页 > 科技论文 > 建筑工程论文 >

某山地风电项目后评价研究

发布时间:2018-08-29 12:19
【摘要】:大力发展风电等可再生能源是国家确定的一项重大能源战略决策,也是我国经济社会可持续发展的客观要求。积极推动风电发展,对于调整国家能源结构,保障能源安全,促进节能减排,保护生态环境具有重要意义。项目后评价是依据国民经济的发展战略和电力发展规划的要求,结合电力建设项目后评价理论与风电场建设的实际工程,通过对已运行风电项目实际统计与前期测算的比较,分析偏差,总结经验,促进项目可行性研究和前期评价的客观性,以提高项目投资管理水平。本文对某山地风电项目开展后评价研究,通过实地调查研究确定了山地风电项目评价的影响因素,分别从项目技术、项目管理、项目经济性等方面展开分析,提出了该山地风电项目后评价指标体系,建立了项目后评价模型与方法,对该山地风电场一期49.5MW工程建设项目进行后评价,并根据评价结论提出了有关的改进和发展建议。研究结果进一步证明了风电项目后评价工作的重要性,必须将风电项目后评价工作推广应用到更多风电工程项目。另一方面,本文通过研究提出了该项目建设工程中存在一些不足和需要进一步改进的地方,为进一步提高山地风电项目建设经济效益提供了有效途径并提供理论性参考依据。
[Abstract]:The development of renewable energy, such as wind power, is an important energy strategic decision made by the country, and is also the objective requirement of sustainable economic and social development in China. Actively promoting the development of wind power is of great significance to adjust the national energy structure, ensure energy security, promote energy saving and emission reduction, and protect the ecological environment. The post-project evaluation is based on the development strategy of the national economy and the requirements of the electric power development planning, combined with the theory of post-evaluation of the electric power construction project and the actual project of wind farm construction, through the comparison between the actual statistics of the running wind power project and the preliminary calculation. Analyze deviation, sum up experience, promote the objectivity of project feasibility study and pre-evaluation, in order to improve the level of project investment management. This paper carries out a post evaluation study on a mountain wind power project, and through field investigation, determines the influencing factors of the mountain wind power project evaluation, respectively from the aspects of project technology, project management, project economy and so on, and analyzes the impact factors of the mountain wind power project evaluation from the aspects of project technology, project management, project economy, etc. This paper puts forward the post evaluation index system of the mountain wind power project, establishes the project post evaluation model and method, carries on the post evaluation to the first stage 49.5MW construction project of the mountain wind farm, and puts forward the related improvement and development suggestion according to the evaluation conclusion. The results further prove the importance of the post evaluation of wind power projects, and it is necessary to popularize the post evaluation of wind power projects to more wind power projects. On the other hand, this paper puts forward some deficiencies and needs further improvement in the construction project of the project, which provides an effective way and theoretical reference for further improving the economic benefit of the mountain wind power project.
【学位授予单位】:华北电力大学(北京)
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:F426.61;TU71

【参考文献】

相关期刊论文 前10条

1 杨龙;;电网投资项目全过程后评价体系研究[J];科技与企业;2015年14期

2 胡殿刚;张雪佼;陈乃仕;张军;余泳;;新能源发电项目多维度后评价方法体系研究[J];电力系统保护与控制;2015年04期

3 康海云;杭乃善;卢桥;詹厚剑;康海兵;成煜;苏毅;;分布式光伏发电在智能电网中的作用分析[J];电网与清洁能源;2013年10期

4 孙丽丽;;浅析项目后评价在水利工程中的应用[J];科技创新与应用;2013年18期

5 张念木;胡连兴;郭建欣;;水电工程后评价的综合评价方法研究[J];天津大学学报(社会科学版);2013年01期

6 郭玉琼;;基于模糊神经网络成功度法的水电建设项目经济后评价方法研究[J];商业文化(下半月);2012年12期

7 朱明琪;张卓然;周航;;基于模糊数学的光伏发电综合效益评价[J];科技风;2011年11期

8 杨丹辉;李红莉;;基于损害和成本的环境污染损失核算——以山东省为例[J];中国工业经济;2010年07期

9 谷永刚;王琨;张波;;分布式发电技术及其应用现状[J];电网与清洁能源;2010年06期

10 赵瑞英;;项目后评价研究及应用[J];山西财经大学学报;2010年S1期

相关硕士学位论文 前2条

1 管崇学;发电项目后评价理论与实证研究[D];华北电力大学(北京);2009年

2 刘岚;风电工程项目后评价指标体系与评价方法研究[D];华北电力大学(北京);2008年



本文编号:2211188

资料下载
论文发表

本文链接:https://www.wllwen.com/jianzhugongchenglunwen/2211188.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户0108d***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com