地连墙基坑开挖中渗流作用对基坑变形的影响
[Abstract]:As the scale of the building is becoming larger and larger, the deep foundation pit works continuously, and the depth of the foundation pit is increasing, so that the deformation of the foundation pit becomes the most important safety index of the foundation pit support. In the various supporting schemes of the foundation pit, the ground connection wall is widely used because of the large rigidity, small deformation, good safety and security, and can be combined with the reverse construction as the structure of the main body, and the research on the deformation of the foundation pit of the ground connection wall is also increased. However, the seepage of groundwater is one of the main factors that affect the deformation of the foundation pit, and the related research is relatively scarce, especially the research on the separate separation of the pore water of the soil. In this paper, the precipitation process of the foundation pit is simulated by the finite element simulation method, and the effect of the seepage of the soil pore water on the deformation of the foundation pit is studied through the study of the deformation of the foundation pit before and after the precipitation analysis step. The main contents of the research are as follows: (1) The process of selecting and analyzing the parameters of the finite element model is introduced, and the excavation process of the whole foundation pit is divided into two analysis steps of precipitation and excavation to distinguish the deformation of the foundation pit caused by two different processes. The simulation results are compared with the measured results to verify the applicability of a foundation pit engineering case by using the described simulation method. (2) A baseline model used as a reference standard was established prior to the study of the impact of the factors. The finite element simulation results of the reference model are analyzed, and the deformation and the characteristics of the foundation pit are described in detail. The lateral deformation of the ground connecting wall, the settlement of the soil mass outside the foundation pit and the base uplift are used as the comparison items of the deformation of the foundation pit, and the specific gravity of the deformation of the foundation pit caused by the precipitation process in the total deformation is analyzed. (3) To change the depth of the ground connection of the wall, compare the deformation and analysis results of the foundation pit with various depth, and obtain the effect of the length of the earth-connecting wall on the deformation of the foundation pit and the size of the seepage. The permeability coefficient, the ratio of porosity and the rebound index of the soil body are changed, and the proportion of the deformation of the foundation pit and the deformation of the precipitation process is also analyzed, and the influence of the soil parameters on the deformation and seepage effect of the foundation pit is studied. (4) Two measures to reduce the influence of seepage: the ground connection wall is embedded in the bedrock, and the dewatering well is set on the periphery of the foundation pit. The finite element simulation of the two measures, except that the relevant parameters of the measures differ in the finite element model, the other parameters are the same as the comparison model, and the simulation results are compared with the results of the reference model to obtain the effect of the two measures.
【学位授予单位】:东南大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TU753
【相似文献】
相关期刊论文 前10条
1 邵春辉;;超深地连墙施工成本构成因素及其计算[J];科技风;2012年01期
2 张吉顺;填海堆石体地基中地连墙施工技术[J];西北水电;2001年04期
3 别社安,李增志,赵冲久;地连墙结构m法计算中的问题和改进[J];土木工程学报;2003年10期
4 刘康和;段伟;刘存忠;;混凝土地连墙质量检测分析[J];水利水电工程设计;2006年01期
5 林海;;简述砼防渗地连墙施工监理控制方法[J];科技传播;2010年13期
6 戢守铭;;上海静安500kV输变电工程地连墙施工[J];水利水电施工;2011年02期
7 牛刚;;关于地连墙施工及渗漏控制的一些看法[J];天津科技;2011年04期
8 胡昌玉;;地铁软土地层超深地连墙施工技术[J];中国高新技术企业;2011年10期
9 张禹;地连墙与钢管支撑在施工中的应用[J];天津建设科技;1996年01期
10 程莉;段伟;;混凝土地连墙质量检测分析[J];工程地质计算机应用;2005年02期
相关会议论文 前7条
1 李军;徐方才;;新加坡地连墙工程施工装备配置及运行管理[A];第八次水利水电地基与基础工程学术会议论文集[C];2006年
2 王万顺;赵克欣;田冬成;孙建会;熊成林;;地连墙在防液化工程中的应用[A];第八次水利水电地基与基础工程学术会议论文集[C];2006年
3 李建高;;超深富水粉砂层中地连墙成槽设备选型[A];中国土木工程学会第十五届年会暨隧道及地下工程分会第十七届年会论文集[C];2012年
4 郭振国;;天津文化中心交通枢纽66.5米深异形地连墙施工技术研究[A];2013中国城市轨道交通关键技术论坛文集——高水平地建设城市轨道交通[C];2013年
5 吴广安;龚木金;;接头板技术在南水北调中线一期穿黄工程北岸竖井地连墙施工中的运用[A];中国岩石力学与工程实例第一届学术会议论文集[C];2007年
6 周昌茂;;海滨潮汐区抛填块石层地连墙施工中的问题[A];地基基础工程与锚固注浆技术:2009年地基基础工程与锚固注浆技术研讨会论文集[C];2009年
7 黄祥平;;北京东干渠工程盾构始发井地连墙施工技术[A];2013水利水电地基与基础工程技术——中国水利学会地基与基础工程专业委员会第12次全国学术会议论文集[C];2013年
相关重要报纸文章 前5条
1 段先锋;成功破解地连墙施工技术难题[N];中煤地质报;2012年
2 刘金晓;阳逻模式[N];中国交通报;2005年
3 宝东 光宇 李响;首钢京唐公司成品码头工程开工建设[N];唐山劳动日报;2007年
4 本报记者 杨宁;重大工程林立 拷问安全质保[N];人民日报;2013年
5 本报记者 周骥 通讯员 徐昭;建一条市民放心的大通道[N];宁波日报;2011年
相关博士学位论文 前1条
1 郭宏智;江苏检察院办案楼承重地连墙支护关键技术研究[D];中国地质大学(北京);2008年
相关硕士学位论文 前7条
1 郭瑞;盾构隧道圆形工作井管片衬砌结构优化及其适应性研究[D];西南交通大学;2015年
2 刘宇宏;深基坑地连墙—锚杆—内支撑支护结构变形分析[D];中国地质大学(北京);2016年
3 黄云天;地连墙基坑开挖中渗流作用对基坑变形的影响[D];东南大学;2015年
4 樊世波;基于敷设土工膜地连墙条件下地下结构的耐久性研究[D];广西大学;2015年
5 连义兵;地连墙H型钢支撑的静态和拟动态分析及稳定性验算[D];天津大学;2012年
6 柏国利;圆形地下连续墙壳体有限元数值模拟分析[D];同济大学;2006年
7 孙冰;电法检测地连墙渗漏模拟试验研究[D];天津大学;2012年
,本文编号:2449210
本文链接:https://www.wllwen.com/jingjilunwen/jianzhujingjilunwen/2449210.html