柴凹输变电工程建设项目综合后评价研究
[Abstract]:Electric energy is the most important energy in our country. In our country, not only the production of electric power affects all aspects of people's production and life, but also the stable transmission of electric power is directly related to the production and life of the people in the society. With the sustained and high-speed economic growth in China, the demand for electric energy is also increasing. In order to ensure the stability of power supply, a large number of power engineering projects have been built in China. The active post-evaluation of electric power construction project can not only summarize the experience and lessons of the construction project, but also provide the decision-making basis for the decision-makers of the follow-up construction project, improve its decision-making level, and guarantee the investment benefit of the re-construction project. In this paper, referring to the relevant literature and combining with the operation characteristics of the power transmission and transformation project itself, a set of index system suitable for the comprehensive post-evaluation of the 110KV transmission and transformer project in Chaiwa is set up, and the multi-level fuzzy comprehensive evaluation is carried out. With this method, the construction project of Chaiwa 110KV power transmission and transformation project is taken as an example to carry on the analysis and research. Firstly, the project post-evaluation index system is established from four aspects: project implementation process post-evaluation, project effectiveness and benefit post-evaluation, project environmental impact assessment, project sustainability post-evaluation, and the rationality of the project implementation process, respectively. The rationality of project effect and benefit, the rationality of project environmental impact and the rationality of project sustainability are analyzed and studied, and then the project post-evaluation of the power transmission and substation construction project is carried out by using multi-level fuzzy analysis method. Finally, it is concluded that the post-evaluation of 110KV power transmission and transformation project in Chaiwa is excellent. The project is successful on the whole, has basically achieved the expected goal, has achieved better economic benefits, and has had a positive impact on the regional economic development. The multi-level fuzzy evaluation method is more scientific and accurate in judging the evaluation results. At present, there is no perfect and unified comprehensive evaluation system and method in the research field of post-evaluation of power transmission and transformation projects in our country. The research in this paper is expected to provide a reference for the post-evaluation of power transmission and transformation projects.
【学位授予单位】:华北电力大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:TM727;F426.61;F284
【相似文献】
相关期刊论文 前10条
1 陈引禄;西北电网750kV输变电工程技术有新突破[J];西北电力技术;2002年04期
2 苏棣芳;创新体制 推进改革——广东省输变电工程公司改制设想[J];中国电力企业管理;2002年05期
3 ;三峡输变电工程建设[J];中国三峡建设;2003年Z1期
4 赖t$;浅谈一化输变电工程造价的控制[J];水利科技;2003年03期
5 毛修业;顺特电气开关产品中标中国第一条750kV输变电工程[J];高电压技术;2004年04期
6 ;世界最大输变电工程主体设备进入安装期[J];广东输电与变电技术;2004年02期
7 ;华阳、德阳500kV输变电工程开建[J];四川电力技术;2004年04期
8 毛修业;顺特电气开关产品中标中国第一条750kV输变电工程[J];高电压技术;2004年S1期
9 牛国栋;;优质高效建设500千伏红河输变电工程[J];云南电业;2006年09期
10 房喜;;750kV输变电示范工程安全运行1周年[J];电力建设;2006年10期
相关会议论文 前10条
1 张萍;张进玉;;输变电工程电磁环境影响与对策探讨[A];山东电机工程学会第四届供电专业学术交流会论文集[C];2007年
2 张进玉;;输变电工程电磁环境影响与对策探讨[A];节能环保 和谐发展——2007中国科协年会论文集(一)[C];2007年
3 王绵斌;黄毅臣;张洁;耿鹏云;;基于概率分析方法的输变电工程造价风险评估模型[A];电网工程造价管理优秀论文[C];2011年
4 汶根社;;小议输变电工程施工及控制管理[A];2010年云南电力技术论坛论文集(文摘部分)[C];2010年
5 马涛;周波;;河西走廊输变电工程水土流失防治与监测技术研究[A];首届干旱半干旱区域水土保持生态保护论坛论文选编[C];2013年
6 苏红专;;输变电工程建设的全过程造价控制管理[A];2007云南电力技术论坛论文集[C];2007年
7 史雪飞;李慧;金莺环;汪亚平;;2010版与2006版国家电网公司输变电工程通用造价差异及应用分析[A];电网工程造价管理优秀论文[C];2011年
8 周海;龙玉海;刘宇;蔡保锐;熊志全;赵建刚;唐敏;;110kV河口—老街输变电工程运行经验总结[A];2006年云南电力技术论坛优秀论文集[C];2006年
9 陈焕;段一雄;;云南输变电建设战略环境影响评价研究[A];2008年云南电力技术论坛论文集[C];2008年
10 赵文平;;500kV输变电工程水土流失及其综合防治措施[A];水与水技术(第二辑)选编[C];2012年
相关重要报纸文章 前10条
1 李克信;国内最长220千伏输变电工程投运[N];中国电力报;2005年
2 魏兴;500千伏北宁输变电工程全面投运[N];东北电力报;2006年
3 王美洲邋记者 周诗泉;500千伏恩施输变电工程进入冲刺阶段[N];恩施日报;2007年
4 邹启昌邋沈祥辉 通讯员 王美洲;500千伏恩施输变电工程竣工投产仪式昨举行[N];恩施日报;2007年
5 钟经;500千伏锡西南输变电工程开工[N];华东电力报;2006年
6 记者 巩国强;全省首座城市中心220千伏输变电工程奠基[N];山西经济日报;2006年
7 王盛 梁益;500千伏临海输变电工程开工[N];台州日报;2007年
8 包国良;我盟220千伏输变电工程建设取得新进展[N];锡林郭勒日报;2007年
9 记者 杨麒钰;青山嘴输变电工程开工建设[N];云南经济日报;2006年
10 董玉平;新疆惠宁输变电工程开工[N];国家电网报;2008年
相关硕士学位论文 前10条
1 陈岩;输变电工程建设项目施工质量管理研究[D];华北电力大学(北京);2011年
2 臧鹏;国外输变电工程项目管理研究[D];郑州大学;2011年
3 卢思瑶;输变电工程后评价相关问题研究[D];华北电力大学;2012年
4 徐辉;500kV仁和输变电工程项目风险分析与管理研究[D];浙江工业大学;2012年
5 寇晨光;输变电工程管理评价指标及方法的研究[D];华北电力大学;2013年
6 司海涛;有小样本数据特征的输变电工程造价估算与灵敏度研究[D];重庆大学;2010年
7 陈小海;输变电工程生产运行自评价模型与方法研究[D];华北电力大学(北京);2011年
8 翟慧娟;输变电工程建设造价管理后评价及其实证研究[D];华北电力大学;2013年
9 郭季璞;陕西省输变电工程水土保持方案设计[D];长安大学;2014年
10 周晓龙;本溪220千伏小市输变电工程后评价研究[D];华北电力大学(北京);2009年
本文编号:2453725
本文链接:https://www.wllwen.com/jingjilunwen/quyujingjilunwen/2453725.html