【摘要】:为解决玉溪煤矿深部松软破碎巷道变形大、变形机理复杂的难题,基于巷道围岩地质力学测试,分析了玉溪矿中央回风大巷变形破坏特征及其失稳机理,认为高地应力、低围岩强度和支护方式不合理是造成巷道围岩变形的主要原因。据此提出了高预紧力高强度支护技术,并进行了现场应用。应用结果表明:采用新支护设计方案后,中央回风大巷两帮未有明显变形,总变形量在27 mm左右,顶板变形总量更小,约为18 mm,有效控制了巷道的长期流变。
[Abstract]:in ord to solve that difficult problem of large deformation and deformation mechanism of the deep and soft broken tunnel in the Yuxi coal mine, based on the geomechanical test of the surrounding rock of the tunnel, the deformation and failure characteristic and the instability mechanism of the large tunnel in the central return air of the Yuxi mine are analyzed, and the high ground stress is considered, The reason that the strength of low surrounding rock and the way of supporting is unreasonable is the main cause of the deformation of the surrounding rock of the tunnel. In this paper, the high-strength supporting technology with high pre-tightening force is put forward, and the field application is carried out. The results show that, after the design of the new support, there is no obvious deformation of the two sides of the central air return roadway, the total deformation is about 27 mm, the total deformation of the top plate is less, about 18 mm, and the long-term flow of the tunnel is effectively controlled.
【作者单位】: 山西兰花科创玉溪煤矿有限责任公司;天地科技股份有限公司开采设计事业部;
【基金】:国家自然科学基金资助项目(U1261211) 国家科技支撑计划资助项目(2012BAB13B02) 科技创新基金面上资助项目(2014MS037)
【分类号】:TD353
本文编号:2518552
[Abstract]:in ord to solve that difficult problem of large deformation and deformation mechanism of the deep and soft broken tunnel in the Yuxi coal mine, based on the geomechanical test of the surrounding rock of the tunnel, the deformation and failure characteristic and the instability mechanism of the large tunnel in the central return air of the Yuxi mine are analyzed, and the high ground stress is considered, The reason that the strength of low surrounding rock and the way of supporting is unreasonable is the main cause of the deformation of the surrounding rock of the tunnel. In this paper, the high-strength supporting technology with high pre-tightening force is put forward, and the field application is carried out. The results show that, after the design of the new support, there is no obvious deformation of the two sides of the central air return roadway, the total deformation is about 27 mm, the total deformation of the top plate is less, about 18 mm, and the long-term flow of the tunnel is effectively controlled.
【作者单位】: 山西兰花科创玉溪煤矿有限责任公司;天地科技股份有限公司开采设计事业部;
【基金】:国家自然科学基金资助项目(U1261211) 国家科技支撑计划资助项目(2012BAB13B02) 科技创新基金面上资助项目(2014MS037)
【分类号】:TD353
【相似文献】
相关期刊论文 前10条
1 贾存华;;不同预紧力锚杆锚索对围岩支护应力场影响研究[J];煤炭技术;2014年06期
2 薛广哲;柏建彪;王襄禹;于洋;李超;;煤巷高预紧力支护的围岩改善原理及控制技术研究[J];煤炭工程;2013年02期
3 刘国庆;王磊;梁明;;矩形巷道支护预紧力对围岩稳定性的影响[J];山西焦煤科技;2014年05期
4 何强;王春丽;;影响锚杆支护预紧力的因素分析与确定[J];煤炭技术;2009年03期
5 王博;惠兴田;刘伟;;锚杆预紧力的支护效应探讨[J];现代矿业;2009年03期
6 张广云;;锚杆预紧扭矩与预紧力关系研究[J];科技情报开发与经济;2011年01期
7 常聚才;谢广祥;;锚杆预紧力对煤矿巷道支护效果的响应特征研究[J];采矿与安全工程学报;2012年05期
8 许兴亮;锚固岩体中锚杆预紧力的作用[J];江苏煤炭;2004年02期
9 李玉梅;郝天轮;;高预紧力锚杆在深部煤巷支护中的应用[J];山东煤炭科技;2013年03期
10 苏海;;锚索预紧力对巷道围岩应力场分布影响研究[J];中国煤炭;2010年09期
相关硕士学位论文 前2条
1 孙雪峰;提高锚杆预紧力技术及装置的研究[D];湖南科技大学;2014年
2 明宗顺;矿用挖掘机履带架螺栓联结特性及强度研究[D];吉林大学;2013年
,本文编号:2518552
本文链接:https://www.wllwen.com/kejilunwen/kuangye/2518552.html