试论辽朝帝王陵寝的营造
[Abstract]:The Liao Dynasty introduced the Central Plains mausoleum system, but did not copy completely in the construction of the mausoleum, but formed its own characteristics with the continuous improvement of relevant systems. The officials of mausoleum construction were not specially set up until the late period of Liao Dynasty, and the imperial concubine was often the ultimate responsibility for the construction of the mausoleum. Mausoleum construction personnel are extensive, mainly divided into corvee, spontaneous participation in the construction, three types of specialized technical personnel. Construction costs in addition to relying mainly on state finance, but also officials, aristocrats to help build mountains. The construction time of mausoleum is influenced by political factors and July period.
【作者单位】: 吉林大学文学院历史系;
【分类号】:K246.1;TU251.2
【相似文献】
相关期刊论文 前10条
1 张曦,万芳;工程造价计费工作改革的探讨[J];福建建筑;1996年04期
2 陈俊,张立人;几项新技术的施工要点及技术经济分析[J];基建优化;2001年06期
3 吴岳;网络计划技术在工程进度计划管理中的应用[J];广州大学学报(自然科学版);2002年06期
4 徐田;弄清成本习性降低工程成本[J];广西土木建筑;1998年03期
5 王宪民;外资工程的机电、合同和设备管理——上海金融广场建设中的实践[J];建设监理;2001年04期
6 兰兴强;普通超高层建筑供电方式的选择[J];安徽建筑;2002年02期
7 郭冬梅,李景鑫;浅谈分户水表安装和改造中的几个问题[J];林业科技情报;2002年01期
8 丰景春;合同项目费用/进度绩效模型研究[J];河海大学学报(自然科学版);2003年01期
9 黄有明;;房屋建筑目标成本控制中的问题和对策[J];科技资讯;2008年03期
10 毛春梅;;浅谈工程费用监理[J];中国西部科技;2008年09期
相关会议论文 前9条
1 徐怡涛;;河北涞源阁院寺文殊殿建筑年代鉴别研究[A];建筑史论文集(第16辑)[C];2002年
2 张驭寰;;北京戒坛山常乐寺复原与后部扩展[A];建筑史论文集(第15辑)[C];2002年
3 丁传全;;利用工程网络计划对费用和工期的优化[A];济大学术论丛土木工程2005专辑[C];2005年
4 胡晓东;黄俊友;俞青荣;;指定厚度混凝土碳化时间的模糊预测[A];第七届全国混凝土耐久性学术交流会论文集[C];2008年
5 胡树银;樊永海;常均海;;上循环水项目 降低输气成本[A];中国土木工程学会城市燃气分会输配专业委员会2005年会议论文集[C];2005年
6 王芳;徐竹青;严丽雪;曹培;;碱渣土工试验方法及其工程土特性研究[A];第一届中国水利水电岩土力学与工程学术讨论会论文集(上册)[C];2006年
7 丁W,
本文编号:2412506
本文链接:https://www.wllwen.com/shekelunwen/zggdslw/2412506.html

