肯尼亚“蒙巴萨-内罗毕”铁路运营风险管理研究
[Abstract]:Under the background of "Silk Road Economic Belt" and "21st Century Maritime Silk Road", China's solid railway technical strength has attracted extensive attention from all over the world, and has also improved the status of China's railway technology in the world. At present, China has begun railway construction in more and more countries and regions, the representative is Saudi Arabia Mecca light rail project, Kenya Mombasa-Nairobi railway (hereinafter referred to as Monet railway), Nema railway, Turkey Ankara to Istanbul high-speed railway project. After the completion of these projects in Africa, the local government usually leaves the projects to Chinese companies to operate in view of the good credibility of the Chinese government and the excellent performance of Chinese companies during the construction phase. In this way, the early construction of the project can be closely related to the later operation, the problem of disconnection between the construction and the operation can be solved, and the smooth operation of the project can be guaranteed. The participation of Chinese enterprises in the operation and management of overseas projects, especially the railway projects constructed by Chinese standards, is beneficial to the project itself, the development of enterprises and the national strategy, and it is also a challenge to enterprises. In this paper, the risk management of Monet railway operation in Kenya is taken as the research object. Firstly, the present situation of risk management of Monet railway operation project is analyzed, and the problems existing in the operation risk management of Monet railway are found out and the reasons are analyzed. The main reasons are as follows: the awareness of risk management is not strong, the risk management organization system is not perfect, the lack of risk management experience of similar projects, the single means of risk management, the lack of professionals and so on. Finally, some suggestions on perfecting the risk management system of railway operation in Mongolia are put forward, which are mainly put forward from five aspects: strengthening the concept of risk management, perfecting the risk management organization, perfecting the risk management system, enriching the risk management methods and paying attention to the cultivation of talents. Overseas railway operation is the last link of the whole industrial chain of Chinese railway going overseas. Through this study, it can not only lay a solid foundation for the strategy of "going out" of Chinese railway, but also provide a reference for risk management of similar overseas railway operation projects in the future, and provide experience in operation and management of Chinese railway going abroad under the situation of "Belt and Road Initiative".
【学位授予单位】:北京交通大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:F531
【参考文献】
相关期刊论文 前10条
1 张志科;刘敬辉;;铁路客运安全风险管理研究[J];铁道运输与经济;2017年03期
2 张磊;;京津冀城际铁路运营管理模式的选择分析[J];铁道运输与经济;2017年03期
3 贺文萍;;坦赞铁路如何重振[J];世界知识;2017年04期
4 汪洋;;新形势下海外建筑项目风险管理的若干问题解析[J];现代经济信息;2015年19期
5 宋同振;;烟台港西港区专用铁路运营模式分析[J];铁道运输与经济;2014年05期
6 邱少明;;美国COSO企业风险管理对我国铁路运输企业的启示[J];理论学习与探索;2012年06期
7 张智媛;;高速铁路运营风险管理研究[J];铁道运营技术;2012年04期
8 王安安;;铁路施工企业海外工程的风险及防控[J];建筑;2012年10期
9 孙林;刘英韬;;中国高速铁路安全管理立法思考[J];铁道经济研究;2012年02期
10 钟登华;蔡绍宽;李玉钦;;基于网络分析法(ANP)的水电工程风险分析及其应用[J];水力发电学报;2008年01期
相关硕士学位论文 前10条
1 张磊;国际工程政治风险“情景—对策”研究[D];东南大学;2016年
2 王建雄;尼日利亚EPC铁路工程风险管理研究[D];华南理工大学;2016年
3 王愫愉;网络众筹平台竞争力评价研究[D];北京交通大学;2016年
4 叶玉竹;铁路建设工程生产安全风险管理[D];兰州交通大学;2015年
5 孙海云;基于安全链条的高铁运营过程安全风险识别及预警研究[D];大连交通大学;2015年
6 陈哲;广东高速公路运营风险管理研究[D];华南理工大学;2015年
7 杨惠文;铁路建设工程施工安全风险网格化管理及应用研究[D];北京交通大学;2015年
8 卢龙强;S公司合同风险管理问题研究[D];大连理工大学;2014年
9 王东;海外EPC总承包项目风险管理研究[D];华南理工大学;2014年
10 甄利贤;大型高速铁路车站客运安全风险分析[D];西南交通大学;2014年
,本文编号:2509353
本文链接:https://www.wllwen.com/jingjilunwen/jtysjj/2509353.html