筏板基础大体积混凝土施工技术研究
[Abstract]:In recent years, with the continuous expansion of the scale of engineering construction in China, high-rise buildings have played an extremely important role in the construction industry. Raft foundation is a common foundation form in high-rise buildings. Its slab thickness is large and it belongs to mass concrete structure. Because the foundation is very important in the high-rise building and the foundation is deepened and extended, the research on the mass concrete construction technology of raft foundation has been paid more and more attention. Crack control is the key research direction of mass concrete in raft foundation. The following aspects are studied in this paper: 1. From the point of view of construction, the characteristics, causes and control measures of mass concrete cracks in raft foundation are analyzed. It is pointed out that the foundation cracks are mainly surface cracks, mainly due to the large deformation of temperature and shrinkage during construction. In this paper, measures are taken to prevent cracks from reducing hydration heat of concrete and improving crack resistance of foundation concrete. 2. Temperature crack calculation of mass concrete in raft foundation. According to the engineering cases, the temperature cracks are calculated systematically, and the maintenance measures are determined according to the calculation results to guide the construction of mass concrete. 3. The construction organization, scheme and construction technology of mass concrete of raft foundation are studied. The measures of temperature control of concrete, pouring of mass concrete, maintenance measures and temperature monitoring are discussed. Emphasis is placed on the construction of the post-pouring belt, the secondary spattering and the temperature monitoring technology. In the engineering case, the corresponding construction measures are selected according to the site conditions, so that the construction can be carried out quickly and effectively. 4. Mass concrete construction quality control of raft foundation. This paper analyzes on the main factors affecting the construction quality, takes the prevention and treatment measures for the common defects of the construction quality, and summarizes the main aspects of improving the construction quality of the mass concrete.
【学位授予单位】:郑州大学
【学位级别】:硕士
【学位授予年份】:2013
【分类号】:TU755
【参考文献】
相关期刊论文 前10条
1 沈武兵;;高层建筑后浇带的留设与施工过程质量控制[J];安徽建筑;2009年06期
2 梁铭健;;大体积混凝土施工方案[J];广东建材;2008年05期
3 严波;大体积混凝土配合比设计与综合温差控制技术[J];混凝土;2004年05期
4 阎培渝,陈广智;养护温度和胶凝材料组成对膨胀剂限制膨胀率的影响[J];建筑技术;2001年01期
5 伍勇华;何廷树;南峰;李国新;梁国正;;大体积混凝土中外加剂的应用[J];建筑技术;2009年08期
6 魏小林;混凝土裂缝产生的原因及预防措施[J];山西建筑;2004年17期
7 杨鸿滨;;基础筏板大体积混凝土施工技术[J];山西建筑;2010年24期
8 刘斌;韩志强;范贵军;;大体积混凝土的配合比设计及原材料的质量要求[J];科技信息;2010年18期
9 朱艳辉;;混凝土结构表面蜂窝麻面形成的原因及消除办法[J];黑龙江科技信息;2010年11期
10 吴涛;;混凝土施工冷缝的预防及处理[J];河南科技;2011年10期
相关博士学位论文 前2条
1 陈斌;混凝土配合比优化及结构早期裂缝防治研究[D];浙江大学;2005年
2 杨和礼;原材料对基础大体积混凝土裂缝的影响与控制[D];武汉大学;2004年
相关硕士学位论文 前5条
1 汪国权;大体积混凝土裂缝及温度应力研究[D];合肥工业大学;2006年
2 孙成城;大体积混凝土温度裂缝控制技术研究及工程实践[D];郑州大学;2006年
3 陈晓光;水工混凝土温度应力分析和温控防裂研究[D];郑州大学;2007年
4 黄子贶;沉降后浇带在高层建筑大底盘基础中的作用研究[D];浙江大学;2007年
5 李克江;大体积混凝土温度裂缝分析与工程应用[D];天津大学;2010年
,本文编号:2413758
本文链接:https://www.wllwen.com/kejilunwen/sgjslw/2413758.html