当前位置:主页 > 科技论文 > 水利工程论文 >

三盛公水利枢纽洪水期排沙分析

发布时间:2018-05-20 12:13

  本文选题:排沙关系 + 洪水 ; 参考:《人民黄河》2017年05期


【摘要】:总结了已有的水库及河道输沙计算方面的研究成果,认为流量、入库含沙量和库区水面比降是影响三盛公水利枢纽出库输沙率的主要因素,其中比降可以用坝前水位变幅来反映。利用2000年以后的进、出库水沙资料,建立了三盛公水利枢纽洪水期出库输沙率的计算公式,并进行了验证计算,结果表明计算值与实测值比较接近,能够满足三盛公水利枢纽洪水期的排沙计算要求。
[Abstract]:The research results of sediment transport in reservoirs and rivers are summarized. It is considered that the discharge, sediment content and water surface ratio drop are the main factors affecting the sediment transport rate of Sanshenggong hydraulic project. The specific drop can be reflected by the variation of the water level in front of the dam. Based on the data of water and sediment coming into and out of reservoir after 2000, the calculation formula of sediment transport rate during flood period of Sanshenggong water conservancy project is established, and the verification calculation is carried out. The results show that the calculated value is close to the measured value. It can meet the requirement of sediment discharge calculation in flood period of Sanshenggong water conservancy project.
【作者单位】: 黄河水利科学研究院水利部黄河泥沙重点实验室;三峡大学水利与环境学院;
【基金】:国家重点研发计划项目(2016YFC0402403) 黄河水利科学研究院年度咨询及跟踪研究项目 国家自然科学基金资助项目(51479081)
【分类号】:TV145

【相似文献】

相关期刊论文 前2条

1 张天红;刘瑞;陈国云;;三盛公水利枢纽水沙变化与库区淤积分析[J];内蒙古水利;2011年01期

2 ;[J];;年期



本文编号:1914575

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/shuiwenshuili/1914575.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户91ede***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com