巴基斯坦阿莱瓦水电站建设全过程索赔案例概述

发布时间:2018-11-22 14:27
【摘要】:随着市场经济的快速发展,越来越多的中国企业到海外开拓市场。但由于工程建设周期长,受当地政策、自然灾害、物价上涨等不确定因素的影响,工程成本会发生变化,承包商为维护自身权益,必然会依据合同提出索赔,因而索赔工作尤为重要。对巴基斯坦阿莱瓦水电站在土建与金结合同执行全过程中,遭遇的所有干扰事件进行了描述,并对索赔依据、索赔计算和索赔金额进行了全面介绍,提供了一个完整的在严重受干扰项目中成功进行全过程索赔的典型案例。索赔经验可为类似工程提供参考。
[Abstract]:With the rapid development of market economy, more and more Chinese enterprises go overseas to open up markets. However, due to the long construction cycle and the influence of uncertain factors such as local policies, natural disasters and rising prices, the cost of the project will change. In order to safeguard its own rights and interests, the contractor will inevitably file a claim on the basis of the contract. Therefore, the claim work is particularly important. In this paper, all the disturbance events encountered in the whole process of the civil construction and the gold joint execution of the Alewa Hydropower Station in Pakistan are described, and the basis of the claim, the calculation of the claim and the amount of the claim are comprehensively introduced. A complete case of successful full-process claims in severely disturbed projects is provided. Claim experience can provide reference for similar projects.
【作者单位】: 东方电气集团国际工程公司;
【分类号】:TV51


本文编号:2349634

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/shuiwenshuili/2349634.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户9d1f9***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com